



Saint Gobain UK Glass immediately placed a further order for half of the remaining joints to be replaced with Floorbridge, this work is now complete and the rest of the remaining joints are scheduled to be replaced with Floorbridge during 2016



Reason for choosing Floorbridge.
We have had constant problems with expansion joints in our concrete floor, basically the joint was pushing against its self, creating a ridge in the floor.
This was having a dramatic effect when trying to engage our VNA vehicles onto our wire guidance system, not to mention an H & S issue, as the trucks would jump off the guidance system often hitting the racking and causing damage to stock.
Work undertaken.
When the FloorBridge team arrived on site they were very professional and advised us of the best way to complete the project.
They came on site at times that suited our work patterns and worked with us to have as little impact as possible on our operation.
The work was completed to a very high standard, with very little dust or debris.
Since Floorbridge.
We have had no problems at all, the cost of maintenance on our equipment as reduced dramatically and the MHE no longer jumps off the guidance system. We have had no damage to stock in the areas where Floorbridge has been installed and many of the drivers have commented about how smoothly the trucks pass over these joints and how much more comfortable it is now.
I would have absolutely no hesitation in recommending Floorbridge.
